top of page
PAST PERFORMANCE
SEE OUR WORK


25-057 | Revolutionizing Fleet Charging Infrastructure with JBrennon Construction's Latest EV Solutions in Atlanta (Phase 2)
JBrennon completed comprehensive EV charging infrastructure improvements within a large, active industrial warehouse, supporting fleet electrification and long-term energy performance. Work included installation of multiple EV charging stations, major electrical service upgrades, underground power distribution, equipment protection, and concrete restoration. The project was executed with careful coordination to maintain safe operations while delivering scalable, renewable-rea
Nov 11, 20254 min read


25-082 | Restoring Functionality: JBrennon Construction's Concrete Renewal at Bulldog Tire & Discounters
JBrennon Construction, Inc. completed a targeted concrete removal and replacement at Bulldog Tire & Discounters in Covington, GA—restoring a worn garage slab for safer, smoother daily operations. See how selective demolition, proper base prep, reinforcement, and curing delivered a durable service-bay surface with minimal disruption.
Jun 30, 20253 min read


25-024 | Empowering the Future of Logistics: The Role of Phase 1 Construction in EV Charging Infrastructure
JBrennon Construction, Inc. completed Phase 1 construction for a design-build EV charging infrastructure project, establishing interior systems required for future fleet electrification. Work included new electrical infrastructure for multiple EV charging stations, interior safety bollards, ventilation systems, dock access improvements, garage doors, and floor preparation for future striping. This phase prepared the facility for scalable, code-compliant EV charging operations
Jun 6, 20254 min read


25-044 | Enhancing EV Charging Infrastructure Through Phase 1 Construction Upgrades
JBrennon Construction, Inc. completed Phase 1 construction upgrades for an EV charging site in Atlanta, focused on safety, compliance, and site usability. Work included installation of protective bollards, surface cleaning, corrected parking and charging striping, and landscape improvements. These targeted construction upgrades enhanced traffic flow, protected charging equipment, and improved the overall functionality and appearance of the EV charging area.
Jun 6, 20252 min read
bottom of page
