top of page
PAST PERFORMANCE
SEE OUR WORK


25-056 | Design-Build Approach for Successful EV Charging Station Development (Phase 2)
JBrennon Construction, Inc. delivered a fully integrated design-build solution for EV charging and infrastructure development, advancing the project from concept through permit-ready construction documents. The work coordinated architectural planning, electrical engineering, civil utilities, and life-safety analysis to support scalable EV charging systems, utility power upgrades, and long-term operational performance in an active industrial environment.
Jul 31, 20253 min read


21-099 | Electric Power Board (EPB) of Chattanooga Design-Build East Operations Center
Chattanooga, TN | Feb 2022 - Jun 2022 Note: Photo is property of TAC. Taken from JBrennon's conceptual design proposal. This design-build...
Jun 30, 20222 min read
bottom of page
