top of page
PAST PERFORMANCE
SEE OUR WORK


25-024 | Empowering the Future of Logistics: The Role of Phase 1 Construction in EV Charging Infrastructure
JBrennon Construction, Inc. completed Phase 1 construction for a design-build EV charging infrastructure project, establishing interior systems required for future fleet electrification. Work included new electrical infrastructure for multiple EV charging stations, interior safety bollards, ventilation systems, dock access improvements, garage doors, and floor preparation for future striping. This phase prepared the facility for scalable, code-compliant EV charging operations
Jun 6, 20254 min read


25-003 | Transforming Warehouses into Cutting-Edge EV Facilities: A Complete Design Breakdown
JBrennon Construction, Inc. delivered Phase 1 design for the transformation of an existing warehouse into a future-ready EV parking and maintenance facility. The coordinated architectural, mechanical, and electrical design established EV-ready parking, maintenance operations, scalable charging infrastructure, and resilient power systems. This phase laid the groundwork for safe, efficient fleet electrification while anticipating long-term growth and evolving transportation tec
Apr 17, 20254 min read


23-056 | Retubing of Boilers
Morgantown, WV | Sep 2023 - Nov 2023 JBrennon evaluated and repaired the fire tubes inherent to a Cleaver Brooks CB 293-350 industrial...
Oct 31, 20231 min read


23-009 | MFG Chemical Utility Room Code Upgrade
Dalton, GA | Apr 2023 An atypical project for JBrennon, we upgraded an out of code utility room with fire rated walls and ceilings....
Apr 28, 20231 min read


21-099 | Electric Power Board (EPB) of Chattanooga Design-Build East Operations Center
Chattanooga, TN | Feb 2022 - Jun 2022 Note: Photo is property of TAC. Taken from JBrennon's conceptual design proposal. This design-build...
Jun 30, 20222 min read
bottom of page
