top of page
PAST PERFORMANCE
SEE OUR WORK


25-057 | Revolutionizing Fleet Charging Infrastructure with JBrennon Construction's Latest EV Solutions in Atlanta (Phase 2)
JBrennon completed comprehensive EV charging infrastructure improvements within a large, active industrial warehouse, supporting fleet electrification and long-term energy performance. Work included installation of multiple EV charging stations, major electrical service upgrades, underground power distribution, equipment protection, and concrete restoration. The project was executed with careful coordination to maintain safe operations while delivering scalable, renewable-rea
Nov 11, 20254 min read


25-056 | Design-Build Approach for Successful EV Charging Station Development (Phase 2)
JBrennon Construction, Inc. delivered a fully integrated design-build solution for EV charging and infrastructure development, advancing the project from concept through permit-ready construction documents. The work coordinated architectural planning, electrical engineering, civil utilities, and life-safety analysis to support scalable EV charging systems, utility power upgrades, and long-term operational performance in an active industrial environment.
Jul 31, 20253 min read


24-031 | Transforming Municipal Maintenance: Upgrades and Innovations in Fort Oglethorpe GA
JBrennon Construction, Inc. completed comprehensive municipal maintenance facility improvements in Fort Oglethorpe, GA, including construction of a new 40' x 80' maintenance garage, expanded office space, major sitework upgrades, and repairs across multiple existing buildings. The project modernized fleet service operations, improved safety and code compliance, and delivered durable infrastructure to support long-term public works needs.
Jul 30, 20254 min read


25-082 | Restoring Functionality: JBrennon Construction's Concrete Renewal at Bulldog Tire & Discounters
JBrennon Construction, Inc. completed a targeted concrete removal and replacement at Bulldog Tire & Discounters in Covington, GA—restoring a worn garage slab for safer, smoother daily operations. See how selective demolition, proper base prep, reinforcement, and curing delivered a durable service-bay surface with minimal disruption.
Jun 29, 20253 min read


25-024 | Empowering the Future of Logistics: The Role of Phase 1 Construction in EV Charging Infrastructure
JBrennon Construction, Inc. completed Phase 1 construction for a design-build EV charging infrastructure project, establishing interior systems required for future fleet electrification. Work included new electrical infrastructure for multiple EV charging stations, interior safety bollards, ventilation systems, dock access improvements, garage doors, and floor preparation for future striping. This phase prepared the facility for scalable, code-compliant EV charging operations
Jun 6, 20254 min read


25-044 | Enhancing EV Charging Infrastructure Through Phase 1 Construction Upgrades
JBrennon Construction, Inc. completed Phase 1 construction upgrades for an EV charging site in Atlanta, focused on safety, compliance, and site usability. Work included installation of protective bollards, surface cleaning, corrected parking and charging striping, and landscape improvements. These targeted construction upgrades enhanced traffic flow, protected charging equipment, and improved the overall functionality and appearance of the EV charging area.
Jun 5, 20252 min read


24-127 | Revamping the Krystal Restaurant: Commercial concrete repair
Here is a **Wix-ready excerpt (under 500 characters)** that fits the concrete repair / sitework theme and is SEO-friendly:
JBrennon Construction, Inc. completed large-scale concrete repairs within an active parking lot, replacing damaged pavement sections to restore safety, durability, and traffic flow. The work included sawcutting, removal, concrete placement, finishing, and coordination around ongoing site use. These repairs improved long-term performance while minimizing
Dec 11, 20242 min read


23-115 | Emergency Dental Office Renovation & Insurance Claim Support – JBrennon Saves the Day
Oral surgery construction and refresh. Emergency repairs from water damage in Columbus, GA.
Feb 29, 20241 min read


22-069 | JBrennon Completes Tire Discounters Auto Garage Remodeling with Full Exterior and Interior Upgrades
Kennesaw, GA | Sep 2023 - Feb 2024 In 2023, Tire Discounters once again trusted JBrennon with a direct-award renovation project. The...
Feb 20, 20241 min read


23-018 | Bubbakoo's Burritos Restaurant Build-out Jonesboro, GA
Jonesboro, GA | Aug 2023 - Dec 2023 This Bubbakoo's Restaurant Build-out coincided with retail strip center new construction performed...
Jan 1, 20241 min read


22-004 | Local 150 Plumbers and Steamfitters Union Training Center
A signature project, JBrennon Construction provided the UA Local 150 Plumbing and Steamfitters with a brand new training center in Augusta.
Jun 15, 20231 min read


23-015 | Dalton Development Partners Interior White Box
Dalton, GA | April 2023 - June 2023 A local project, JBrennon converted a dark shell with slab to a white box for Dalton Development...
Jun 1, 20231 min read


22-083 | Hummus Republic Druid Hills
Druid Hills, GA | Feb 2023 – Apr 2023 JBrennon provided general contracting and design-build services to one of Hummus Republic’s first...
Apr 30, 20231 min read


22-048 | Tire Discounters Newnan Renovation
Newnan, GA | Oct 2022 – Dec 2022 Construction efforts required night work and activities around an active, “open to public” Tire...
Dec 23, 20221 min read


22-087 | North American Dental Group | Millwork & Trim Repair
installation of additional millwork and trim items within an active, professional North American Dental Group (NADG) office interior.
Nov 2, 20221 min read


21-083 | Dalton Car-Mart Exterior Repairs
Dalton, GA | Oct 2021 - Dec 2021 A local project, JBrennon provided subcontracting services to Carmart of America's construction...
Jan 1, 20221 min read


21-101 | Door and Hardware Installation
Fairburn, GA | Dec 2021 At the request of Watkins Real Estate of Atlanta, GA, a long standing client of JBrennon, our team of installers...
Dec 21, 20211 min read


21-082 | Dalton Brewing Company Service Work
Dalton, GA | Oct 2021 A local project, JBrennon provided demolition of interior walls, exterior concrete pads, and preparation of a new...
Oct 28, 20211 min read


21-087 | TDG HVAC Service Call
Athens, GA | Oct 2021 JBrennon provided an out of the norm, HVAC service call and compressor pump exchange for TDG, the service arm for...
Oct 5, 20211 min read


19-075 | Beautiful Smiles Dalton, GA
Dalton, GA | Sep 2020 - May 2021 JBrennon Construction and Beautiful Smiles Dentistry partnered on a design-build remodel of an existing...
May 4, 20211 min read
bottom of page
