Renovating a restaurant’s exterior is a complex task that requires careful planning, precise execution, and attention to detail. The recent upgrade of the Krystal restaurant at 713 W Oglethorpe Blvd, Albany, GA, carried out by JBrennon Construction, Inc., offers a clear example of how to approach such a project effectively. This guide walks you through the key steps taken during this renovation, highlighting practical insights and lessons that can help anyone planning a similar upgrade requiring commercial concrete repair.

Planning and Preparation
Before any physical work began, the project team focused on thorough preparation. This phase included:
Reviewing the approved proposal and specifications to ensure all work aligned with client expectations and local regulations.
Coordinating with suppliers and rental companies to secure necessary materials and equipment.
Scheduling demolition and construction activities to minimize disruption to restaurant operations.
A critical early step was the removal of existing exterior signage and concrete. This cleared the way for new foundations and electrical infrastructure, setting a solid base for the upgrade.
Demolition and Site Clearing
Removing old structures is often the most visible and disruptive part of exterior renovation. At the Krystal site, the team carefully dismantled the existing signage and broke up concrete surfaces. This process involved:
Using specialized equipment to safely remove materials without damaging the building.
Disposing of debris according to environmental and safety standards.
Preparing the site for new construction by leveling and cleaning the area.
This stage required close supervision to ensure compliance with safety protocols and project specifications.
Foundation and Electrical Infrastructure Installation
With the site cleared, the next focus was on laying a new foundation and upgrading electrical systems. These steps included:
Pouring a new concrete foundation designed to support updated exterior features.
Assessing power requirements to accommodate new lighting, signage, and other electrical components.
Installing dedicated power outlets inside the restaurant, including three duplex outlets and a quad outlet on a wall for efficient power distribution.
Running electrical conduit and power lines, including low voltage conduit for exterior systems.
Adding a 1.5-inch conduit specifically for data connections to the new foundation, focusing on labor efforts to ensure proper installation.
These upgrades ensured the restaurant’s exterior would have reliable power and data connectivity to support modern systems.
Coordination with Keyser Team and Material Procurement
The renovation included preparing the site for the arrival of the Keyser Team, who would handle further exterior installations. This preparation involved:
Removing existing menu boards to clear space for new displays.
Procuring all necessary materials ahead of time to avoid delays.
Renting equipment as needed to support specialized tasks.
Effective coordination between construction and installation teams helped maintain the project timeline and quality standards.
Final Inspections and Compliance
The last phase involved thorough inspections to confirm that all work met the approved contract and local regulations. This included:
Verifying the structural integrity of the new foundation.
Testing electrical installations for safety and functionality.
Ensuring all exterior upgrades complied with zoning and building codes.
Passing these inspections was essential to officially complete the renovation and reopen the restaurant with confidence.