top of page
PAST PERFORMANCE
SEE OUR WORK


25-057 | Revolutionizing Fleet Charging Infrastructure with JBrennon Construction's Latest EV Solutions in Atlanta (Phase 2)
JBrennon completed comprehensive EV charging infrastructure improvements within a large, active industrial warehouse, supporting fleet electrification and long-term energy performance. Work included installation of multiple EV charging stations, major electrical service upgrades, underground power distribution, equipment protection, and concrete restoration. The project was executed with careful coordination to maintain safe operations while delivering scalable, renewable-rea
Nov 11, 20254 min read


24-031 | Transforming Municipal Maintenance: Upgrades and Innovations in Fort Oglethorpe GA
JBrennon Construction, Inc. completed comprehensive municipal maintenance facility improvements in Fort Oglethorpe, GA, including construction of a new 40' x 80' maintenance garage, expanded office space, major sitework upgrades, and repairs across multiple existing buildings. The project modernized fleet service operations, improved safety and code compliance, and delivered durable infrastructure to support long-term public works needs.
Jul 30, 20254 min read


25-024 | Empowering the Future of Logistics: The Role of Phase 1 Construction in EV Charging Infrastructure
JBrennon Construction, Inc. completed Phase 1 construction for a design-build EV charging infrastructure project, establishing interior systems required for future fleet electrification. Work included new electrical infrastructure for multiple EV charging stations, interior safety bollards, ventilation systems, dock access improvements, garage doors, and floor preparation for future striping. This phase prepared the facility for scalable, code-compliant EV charging operations
Jun 6, 20254 min read


25-044 | Enhancing EV Charging Infrastructure Through Phase 1 Construction Upgrades
JBrennon Construction, Inc. completed Phase 1 construction upgrades for an EV charging site in Atlanta, focused on safety, compliance, and site usability. Work included installation of protective bollards, surface cleaning, corrected parking and charging striping, and landscape improvements. These targeted construction upgrades enhanced traffic flow, protected charging equipment, and improved the overall functionality and appearance of the EV charging area.
Jun 5, 20252 min read


25-003 | Transforming Warehouses into Cutting-Edge EV Facilities: A Complete Design Breakdown
JBrennon Construction, Inc. delivered Phase 1 design for the transformation of an existing warehouse into a future-ready EV parking and maintenance facility. The coordinated architectural, mechanical, and electrical design established EV-ready parking, maintenance operations, scalable charging infrastructure, and resilient power systems. This phase laid the groundwork for safe, efficient fleet electrification while anticipating long-term growth and evolving transportation tec
Apr 17, 20254 min read


24-127 | Revamping the Krystal Restaurant: Commercial concrete repair
Here is a **Wix-ready excerpt (under 500 characters)** that fits the concrete repair / sitework theme and is SEO-friendly:
JBrennon Construction, Inc. completed large-scale concrete repairs within an active parking lot, replacing damaged pavement sections to restore safety, durability, and traffic flow. The work included sawcutting, removal, concrete placement, finishing, and coordination around ongoing site use. These repairs improved long-term performance while minimizing
Dec 11, 20242 min read


23-018 | Bubbakoo's Burritos Restaurant Build-out Jonesboro, GA
Jonesboro, GA | Aug 2023 - Dec 2023 This Bubbakoo's Restaurant Build-out coincided with retail strip center new construction performed...
Jan 1, 20241 min read


23-014 | National Park Service (NPS) Historic Preservation at Lookout Mountain Visitor Center Upgrades
Lookout Mountain, TN | Apr 2023 - Sep 2023 Working directly with the National Park Service, JBrennon Construction proudly led a...
Sep 29, 20231 min read


22-004 | Local 150 Plumbers and Steamfitters Union Training Center
A signature project, JBrennon Construction provided the UA Local 150 Plumbing and Steamfitters with a brand new training center in Augusta.
Jun 15, 20231 min read


23-015 | Dalton Development Partners Interior White Box
Dalton, GA | April 2023 - June 2023 A local project, JBrennon converted a dark shell with slab to a white box for Dalton Development...
Jun 1, 20231 min read


22-083 | Hummus Republic Druid Hills
Druid Hills, GA | Feb 2023 – Apr 2023 JBrennon provided general contracting and design-build services to one of Hummus Republic’s first...
Apr 30, 20231 min read


22-034 / 22-046 | Bubbakoo's Hamilton, OH
Hamilton, OH | Oct 2022 – Mar 2023 A combined landlord shell and tenant build-out project, this job spanned six months due to scope of...
Mar 31, 20231 min read


22-048 | Tire Discounters Newnan Renovation
Newnan, GA | Oct 2022 – Dec 2022 Construction efforts required night work and activities around an active, “open to public” Tire...
Dec 23, 20221 min read


22-066 | Centers for Disease Control (CDC) | IDIQ
Morgantown, WV | Pittsburgh, PA | Cincinnati, OH | Jan 2023 - Dec 2027 Construction projects under this contract shall be awarded by...
Dec 19, 20221 min read


22-007 | Bubbakoo's Burritos Broadview, OH
Broadview, OH | Jul 2022 - Sep 2022 This interior build-out required the demolition of all existing interior fixtures and partition walls...
Sep 21, 20221 min read


21-082 | Dalton Brewing Company Service Work
Dalton, GA | Oct 2021 A local project, JBrennon provided demolition of interior walls, exterior concrete pads, and preparation of a new...
Oct 28, 20211 min read


21-102 | Bubbakoo's Clarksville, TN
Clarksville, TN | Jun 2021 - Sep 2021 A standard, tenant build-out project, this job required typical construction efforts per Bubbakoos...
Sep 29, 20211 min read


19-075 | Beautiful Smiles Dalton, GA
Dalton, GA | Sep 2020 - May 2021 JBrennon Construction and Beautiful Smiles Dentistry partnered on a design-build remodel of an existing...
May 4, 20211 min read


20-018 | Oak Ridge National Laboratory | Salt Storage Facility
Oak Ridge, TN | Jul 2020 - Jan 2021 Project Description The Salt Storage Facility comprised excavation, site grading, and concrete pad...
Jan 31, 20211 min read


20-017 | Oak Ridge National Laboratory | Chiller, HVAC & Electrical Upgrades
Oak Ridge, TN | Jun 2020 - Jan 2021 Project Description The project comprised demolition of existing HVAC and electrical systems at Bldg....
Jan 1, 20211 min read
bottom of page
