Atlanta EV Fleet Charging Infrastructure: From Permit Strategy to Fleet-Ready Operations
Across six coordinated Atlanta engagements, JBrennon supported the permitting, design, construction, and expansion of an active autonomous-vehicle fleet hub. Work included converting a roughly 100,000-square-foot warehouse; high-speed doors, dock ramps, HVAC and life-safety upgrades; more than 150 protective bollards; a 2.5 MVA transformer; switchgear; directional boring; 15 remaining EV charging stations; standby-power integration; fencing, gates, and a companion charging-ar


Chattanooga TPO Roof Replacement with a 368-Panel Solar Array at Developmental Resource Center
JBrennon completed a Chattanooga TPO Roof Replacement and solar installation at the Development Resource Center. The project combined more than 25,000 square feet of 80-mil membrane, 45 tons of structural steel, 17 customized parapet supports, and a 368-panel photovoltaic array.