top of page


Restoring Raw Water Pumping Capacity for the City of Cornelia
JBrennon completed raw water pump station rehabilitation for the City of Cornelia, replacing a vertical turbine pump, renewing piping and the creek intake, integrating electrical controls, and restoring the operating facility through carefully sequenced shutdowns.


Laboratory Reverse Osmosis Piping Replacement in an Active Research Facility
JBrennon replaced an aging laboratory reverse osmosis piping system across multiple active research buildings. New LXT PVC mains, laterals, valves, and service connections were installed using contamination-control methods, then pressure-tested, flushed, and recommissioned one phase at a time.
bottom of page