Laboratory Cage Washer Replacement in an Active Research Facility
JBrennon completed a laboratory cage washer replacement inside an active federal research facility, coordinating containment, phased demolition, two new Tecniplast units, utility connections, pit restoration, compressed air, testing, and commissioning.


Vacuum-Jacketed Cryogenic Piping Upgrade for an Active Facility
See how JBrennon completed a vacuum-jacketed cryogenic piping upgrade in an active facility, replacing compromised piping with a tested stainless-steel system while coordinating shutdown, installation, and final restoration.


Federal Freight Elevator Replacement: Modernizing a 1968 Hydraulic System
JBrennon completed a Morgantown freight elevator replacement inside an active research and laboratory facility. The turnkey project replaced the hydraulic power unit, controller, wiring, doors, safety devices, cab, accessible fixtures, and fire-alarm interfaces with maintainable, non-proprietary systems.


Design-Build Elevator Pit Remediation After Concealed Conditions
JBrennon completed design-build elevator pit remediation at an active industrial facility after demolition exposed a concealed subsurface void and undocumented structural conditions. The revised work included exploratory investigation, engineered formwork, 23 cubic yards of concrete infill, high-strength grout placement, strength testing, and final pit restoration.


Commercial Roofing Replacement and Restoration at an Active Research Campus
The Morgantown Commercial Roofing Replacement and restoration upgraded three roof areas at an active CDC/NIOSH research campus. JBrennon installed two high-performance replacement systems and restored a third roof using low-odor adhesives, tapered insulation, reinforced membranes, new flashings, coping, and daily watertight sequencing.


Clean Steam Generator Replacement in an Active Laboratory
JBrennon completed clean steam generator replacement in an active laboratory, phasing two new units, flash tanks, water softeners, piping, insulation, and controls so one generator remained online throughout the work.